Construction Site Delivery Notes (DDT): Receipt to Invoice

Delivery-note pain is not the paper, it is the exceptions between order, DDT and invoice: who closes each one, plus a sample DDT register.

Quick Answer

Managing DDTs (Documento di Trasporto, the Italian delivery note) at a construction site comes down to three checks at three moments: at receipt (unloaded goods against the DDT and the order, with reservations written on the DDT before signing), in the office (every DDT logged against the right job), and at invoicing (three-way matching of order, DDT and supplier invoice). The time is not lost on the documents that agree. It is lost on the exceptions.

Where Delivery Note Handling Actually Breaks

The site manager counts the goods against the paper DDT, but the purchase order is back at the office, so the note is checked against itself. It gets signed without reservations because the truck has to leave, reaches the office days later, and the supplier's deferred invoice then references every DDT of the period. Exceptions are discovered at the last step, when the note is signed and the invoice issued.

Exceptions at Receipt

  • Short delivery: write the quantity actually received on the DDT before signing; purchasing claims the balance or a credit note.
  • Wrong item or an unrequested "equivalent": reservation or refusal; the site manager decides technically, purchasing on price.
  • Transport damage: a specific reservation with a photo.
  • Delivery with no order in the system: record who asked for it; purchasing raises the order or disputes the delivery.
  • DDT addressed to another site: record the real site; the office reassigns the job.
  • Partial delivery on an open order: record this delivery only; the register keeps the running balance.
  • Reinforcing or structural steel without the qualification-certificate reference on the DDT: under Italy's NTC 2018 (§11.3.1.5) that reference must be on the transport document, and the works director must check it and refuse non-conforming supplies before installation.

Exceptions in Three-Way Matching

Price outside the agreed tolerance, invoiced quantity above the sum of received quantities, a deferred invoice that cites a DDT missing from the register, a full invoice despite a reservation on the DDT, and charges the order never covered (transport, pump hire, truck waiting time) each need their own rule and their own owner. The general mechanism is covered in our goods-receipt and invoice matching guide.

The DDT Register

One row per DDT line: DDT number and date, supplier, site and job, order, item, DDT quantity, received quantity, reservations, technical documents, received by, invoice, status, and who owns the open exception. Received quantity is what gets paid; the owner column turns the register from an archive into a to-do list.

What Is a Rule and What Needs a Model

Reading the photographed note and handwritten reservations needs a model. Finding the order, applying tolerances, matching the invoice and routing exceptions are rules. Accepting a substitute product or steel with incomplete papers stays with a person.

Frequently asked questions

Edilizia10 min2026-03-30

Share this article

Mike Cecconello

Mike Cecconello

Founder, SUPALABS

Founder of SUPALABS, an embedded AI operator for European companies. Works inside client organisations to rebuild how work runs — designing and shipping production AI systems across finance, operations, HR and customer support, then handing ownership to the client's own team.

Experience

5+ years building AI and automation systems for European companies

Expertise
  • AI-Native Process Redesign
  • Production AI Systems
  • Embedded Delivery
  • Enterprise AI Strategy
Supalabs AI solutions